Showing posts with label Get It Done. Show all posts
Showing posts with label Get It Done. Show all posts

Saturday, February 2, 2013

"Get It Done" in February 2013

Judy at Patchwork Times is helping us to get projects done in 2013
by sponsoring "Get It Done".
We are to blog about 4 items we want to get done during the month.

During the month of January, I completed the following items:

I attached the handing sleeve and binding on my Feathered Peacock Star, so it could be entered in the Lake Farm Park Quilts 2013.  Unfortunately no ribbon this year.

I prepared the backs for 3 Alaskan theme quilts and had them quilted by Becky at Ruby Blue Quilts.  This link will take you to Becky's blog so you can see the beautiful quilting that she did.

I did finalize the design and start the WaterFalls paper piecing quilt I'm making for Cassie.

And I did finalize the design for Sara's baby quilt.

I'm pretty happy with what I accomplished this month!!
For the month of February I need to complete the following items.

1

Binding the 3 Alaskan quilts.


After our trip to Alaska 5 years ago, our quilt will be done!!!

2

Complete Sara's baby quilt, which is also a pattern I'm testing for Jessie at The Whole Bolt.

This little guy will be tumbling across the baby quilt!

3

Continue working on Cassie's Waterfall quilt.  I have one of the columns done.


4

Fianlize the design and then start assigning the fabrics to my next Judy and Brad Niemeyer quilt which is a Mariner's Compass.

 
I really think if I put my mind to it I can "Get It Done" in February!!


 

Monday, December 31, 2012

"Get It Done" in January 2013

Judy at Patchwork Times is helping us to get projects done in 2013
by sponsoring "Get It Done". 
 
We are to blog about 4 items we want to get done during the month.
 
For the month of January I need to complete the following items.
 
1
 
Hanging sleeve and bind my Feathered Peacock Star Wall hanging
 
 
This is my second Judy and Brad Niemeyer pattern and Becky Silbaugh at Ruby Blue Quilting studio did a great job with the quilting.  Becky has a post at her blog with pictures of this quilt in progress.  This quilt needs done by January 19th so that it can be delivered to the Lake Farm Parks for Quilts 2013.
 
2
 
Scene in Alaska Quilt Kit
 
 
This is the fourth Lisa Moore pattern I have completed since traveling to Alaska in 2008.
My friend Doris traveled to Alaska this past June and asked if I could complete the 2 kits she picked up there.  I need to finish the shasings and borders.
 
3
 
Cassie's Brown and Teal quilt
 
I would like to finalize the pattern I will be doing for Cassie's quilt.  I will be doing a Judy and Brad Niemeyer pattern, but I have to decide one which one.  Then I'm going to design it in EQ7 so I can add the fabrics.  I'm leaning toward Waterfalls.
 
 
4
 
Sara's Baby quilt
 
My hairdresser is expecting her 2nd child this winter, so I will be doing a boy's baby quilt.
I have to design it in EQ7 and then start cutting and piecing.
 
 
I have some left overs from another baby quilt I did last year, called Sea of Dreams by South Sea Imports.  So I thought I would use that fabric to make up a simple block and rectangle quilt.
 
Ok now I have my goals for January lets see how many of them I "Get Done"!!!